Friday, July 4, 2014

big goals to hit in 2014/15

we hope that in this coming 12 months, some big things can be achieved, besides those small upgrades here & there...

in fact to set vision like this is very important, that was how we have dreamt & eventually to see it happened later for some big projects like entrance shade & blk k lifts upgrade. (actually other smaller projects like walkway shade, kids playground, CCTV were also went through the process of converting the vision into reality, but bigger vision will normally take much longer time to see the actualization.)

first one is the sinking fund, for we have tried very hard & so far what we have is paper judgement from the high court that we have won the case & the developer should transferred those money to us, but..., well we haven't give up yet, right now still trying all available option to recovered the money & hope to see hope break through in this coming 12 months.

second one will be the blk j & k building repainting, as now the MC have been given the green light to go ahead to apply fund from state gov't on the sharing cost of 80% - 20% basis, we should quickly decide in the MC meeting which quotations we would like to submit to the state gov't for their consideration, and to see our buildings with the new coats before next July, all by God's grace :)

third one is to replace at least 4 water tank lining, for we have at the moment 8 water tanks for residents' domestic use, 4 on top of blk k roof, another 4 at blk j rooftop, these water tanks have been serving our residents faithfully for coming to 20 years already, many of them share the common problem, ie the lining (the plastic-like material which holding the water inside the tank) start to give way & some of them have reached the stage of beyond repair, for which the replacement is needed to prevent water leakage, each water tank lining will cost from 8K to 12K depending on it's size, the good news is state gov't have approved our application of 20K to replace 2 lining, for which they will absorb 16K & from our management fund 4K, we will try to get approval in this coming MC meeting & then hopefully to send the 4K cheq to the state gov't to issue work order to the contractor to commence work on the 2 tanks (each blk one tank) as soon as possible. We wish after the 2 linings are replaced we will be able to get more fund from them to replace another 2 water tank linings in this coming 12 months.

God pls hep us..... :)



5 comments:

BJR said...

Dear MC,
Thanks you so much for the update and also setting goals to improve the condo.

I can see our condo is becoming a better to stay!

Thanks & gratitude to these unpaid heroes!

Management Corporation :- said...

hi,

thanks... :)

just trying our best to do something for our beloved Vista residents.

best regards.

Anonymous said...

HI,

Just wanted to bring to your attention that the lights between 7 and 8 floor at Block J, staircase area has been out for atleast three months now. Made a report to the office but nothing has been done up to today. Can you please assist to look into this.
Thanks you

Management Corporation :- said...

hi,

a bit surprise why it's dragged so long, will contact the electrician on Monday to attend to it, thanks.

regards.

Anonymous said...

Also noticed Blk J 14th flr corridor light also out for at least 5mths now. Can get the electrician to check as well.thks.