now we r all the more convinced that we should terminate awan setia, & in fact we should hv done it many years ago.

we hv just recently done the inspection on the common facility, the water tank, pump, TNB room, telekom room, lift motor room....., to our shocking, there r 3 mojor leaks at our water tanks (1 at block-K rooftop, 1 at block-K ground floor, 1 at block-J ground floor).

from the stain we saw at the leaking area, these problem should hv been there easily few years, how bad these leak? each tank's leak is abt 5x of the water flow out from the water tape of ur kitchen, this could easily wasted our residents' money perhaps more than RM1000 per month!

we should blame awan setia for did not bother to fix it, but we hv found something even worse! some maintenance guy (in the past) found the leak at the water tank of block-J ground floor pump room, instead of fixing it, he just hacked a hole at the wall of the pump room, so that the water leaked from the water tank will flow into the common drain!!! what a irresponsible attitude & action they show!!!

we r at the moment fixing the water tank at roof top of block-K, cost abt RM2000, the another 2 water tanks need to be fixed soon, most probably another RM4000, JMB hv to find way to get RM6000 to fix these problem, we r crossing our figure praying that there's no other major repair work needed....

and as for this irresponsible management agent, we should hv terminated them much earlier on....