Friday, October 18, 2013

upgraded lift running, and under monitoring

the upgraded lift of blk k started the full operation last Saturday afternoon, except on the same night due to some technical issue which halted the operation but resumed on next day, so far it's ok, so which it has been running for one week already.

we are still monitoring the performance of this lift, of course as we always carefully telling our residents that it's upgraded lift but not completely new one, we should not expect it run as smooth as new lift, but then compare to other 3 lifts of Vista Condo, we should feel the different, quieter & smoother.

we are not in the hurry to start the 2nd lift upgrade, mainly because we want to make sure this upgraded unit is stable & reliable enough to carry out it's duty when we shut down another lift later, another reason is at the beginning of November there's a holiday week, Deepavali & Awal Muharram, we have received request that have both lift running because some blk k residents their relatives & friends will be visiting them during these holidays.

so tentatively we set time for 2nd lift upgrade at the week after these holidays, and we do expect the 2nd upgrade will take much shorter than the 1st upgrade, reasonable time frame should be 3 to 4 weeks.

so now our prayer to God is this upgraded lift will continue to perform well, and later on when we do the 2nd lift upgrade, it won't take more than 1 month..... :)

thanks.


5 comments:

Anonymous said...

Good job

Anonymous said...

As per last 2 post...
How the update on re-paint project ( not include corridor ) ?
Did already received quotation from contractor ?

Anonymous said...

Hi MC & JBM

By any chance you can repair the Blk K G floor call button 4 the old lift cause still got another 2 or more month to Go before they upgrade the lift.

Thx

BJR said...

Thank you MC and thanks God too.

Hopefully we will have a smooth 2nd lift upgrade. Please also remember to change the number button for the lift at block J using the spare parts from the old lift. That would be almost perfect for Vista Condo.

May everyone in Blick K be happy with the new lift.

Management Corporation :- said...

hi,

thanks for all the encouragement, feedback, and suggestion,

1) so far we haven't got any painting vendor to agree with the long payment term.

2) lift button at blk k ground can't be used due to technical setting of the old lift, which according to vendor, once one lift is not running (i mean old lift) then automatically the other old lift ground flr hall calling button can't function, this is something we have been nagging them since long time ago to solve but it's a built in feature, nothing can be done unless change the system like what are we doing now.

3) the 2nd lift upgrade most likely a week after Deepavali, and ground flr hall calling button will be functioning as normal one as it's from a new system.

4) yes we are shifting some of the re-use-able part from blk k lift for blk j lift, including the button.

thanks.